Basement Pouring in Progress – Hackney, London

Posted · Add Comment

Work has commenced on the basement section on our contract in Hackney, London. The excavations around the site have been supported using a gabion type system of mesh and concrete to stabilize the banks.

We are using waterproof concrete in the basement construction which is SIKA approved. The waterbar is like a rubber strip installed into the kicker to prevent any water ingress at this point. A SIKA representative is inspecting all aspects of the work.

Slab being Poured

 

 
 