Block of Three Houses, Hackney – Project Update

Posted · Add Comment

Work has progressed on site since our last newsletter. The zinc roof is now complete as you can see from the picture and there is also a greenhouse which located on the top floor of one of the houses. The drainage works have begun on site and are progressing well. The drainage design is our own design as we are quite experienced in this kind of work. Internally the guys have begun installing the engineered oak flooring, skirtings and doors. Check out this youtube link http://www.youtube.com/watch?v=c7aySD_fIDc  to see the doors we have installed from Germany specified by the architects Wilton Studio Ltd.

IMG_1908[1]

IMG_1909[1]

 
 

VIEW MORE LIVE PROJECTS

Textbox Section

Subscribe to our newsletter

Read about our latest updates and live projects straight from your inbox

 








 
%d bloggers like this: