Foundations Complete – Dulwich Residential Contract March 2013

Posted · Add Comment

The foundations have been poured using an FND2 mix. As you can see from the picture the blocks and drainage materials are being delivered getting ready for the construction of the rising walls for the beam and block floor and the drainage.

IMG_1082

 
 